PubChem ↗
NIH chemical identities, structures and linked evidence.
RESEARCH · NO SIGN-IN REQUIRED
Search a curated directory of primary research, business and infrastructure sources.
Free browser tool · No AI data charge · No account records or provider requests
Explore selected source links or search this directory. Not a live web crawl.
NIH chemical identities, structures and linked evidence.
Biomedical literature index. Read original studies and their limitations.
Find research publications and DOI records.
Official business planning, launch and management guidance.
NASA sought proposals for technology and infrastructure supporting long-duration lunar surface work. Check the live solicitation before acting on deadlines.
Source date: 2026-09-08FAA's official project hub covers the Boca Chica, Cameron County Starship/Super Heavy environmental reviews and associated licensing records. A proposal or review is not an approval.
Source date: 2026-10-22SpaceX's own launch index includes Starbase, Texas. Use its mission entries to verify flight milestones rather than treating announced schedules as completed launches.
Source date: Live source · checked 2026-10-26Caltech's SSPD-1/MAPLE experiment demonstrated wireless power transfer in space and a detectable beam directed to Earth. This was a prototype experiment, not an operating utility or energy without a source.
Source date: 2024-01-16NASA describes Merck-sponsored ISS crystal-growth work that informed a pembrolizumab formulation. It illustrates a research service opportunity; it does not establish that a new molecule or treatment generated here is safe, effective or approved.
Source date: 2026-01-06EIA's February outlook reported 43.4 GW of planned US utility-scale solar additions for 2026, with Texas representing 40% of those planned additions. Planned additions are not confirmed operating capacity.
Source date: 2026-02-20Dow and X-energy announced submission of a construction permit application for a proposed Seadrift, Texas project. This is an application milestone, not evidence of an operating reactor.
Source date: 2025-03-31NRC's notice described a construction-permit hearing for a four-reactor Long Mott facility in Calhoun County. The scheduled September hearing and October comment deadline are historical; permit status needs a new check.
Source date: 2026-08-20NASA lists the final Appendix A solicitation issued September 8, 2026 and distinguishes technology development toward TRL 5–6 from Appendix B integrated demonstrations at TRL 6 and beyond. Verify current SAM.gov amendments and eligibility before bidding; this is not an award.
Source date: 2026-09-25USDA released its 2024 AFIDA report in January 2026, reporting about 46 million acres of foreign interests as of December 31, 2024. AFIDA interests can include ownership and long-term lease interests; they are not all foreign-government purchases or food-producing cropland.
Source date: 2026-01-22Official interactive AFIDA map for exploring disclosed foreign agricultural interests. Use reported country/interest classifications, not assumptions based on names or ethnicity.
Source date: Live source · checked 2026-10-26USDA’s September 23, 2026 update reports national farm real-estate value of $4,500/acre, versus $3,000/acre for the Southern Plains region. Regional and national averages include buildings; neither is an Austin or South Texas parcel appraisal. Local soil, water access and buyer demand need separate evidence.
Source date: 2026-09-23USDA examines controlled-environment agriculture and agrivoltaics, including opportunities and constraints. Model energy, labor, capital, crop economics and buyer demand rather than assuming indoor cultivation is automatically profitable.
Source date: 2024Official soil mapping and interpretations support preliminary land-use review. Local sampling, drainage analysis and professional site assessment remain necessary.
Source date: Live source · checked 2026-10-26Official elevation, hydrography, structures, transportation, land-cover and orthoimagery resources. Acquisition dates and resolution vary; these datasets do not certify current boundaries or replace a survey.
Source date: Live source · checked 2026-10-26Texas RRC provides mapped well, oil/gas and pipeline records. This is a screening layer, not a complete underground-utility survey, mineral-title opinion or excavation clearance.
Source date: Live source · checked 2026-10-263DEP supplies bare-earth elevation and point-cloud resources for preliminary slope and terrain analysis. Dataset quality, coverage and collection date must be inspected for each site.
Source date: Live source · checked 2026-10-26TWDB adopted Phase I on July 23, 2026. Comments on the proposed Phase II amendment closed September 25; adoption consideration is tentatively planned for December 2026. Use regional supply and strategy records for farm and campus screening; planning entries do not secure site water rights or service.
Source date: 2026-07-23Tract lists 2,973 acres and 4,000 MW of site-design capacity, with site energization targeted for 2028. These are developer plans, not delivered compute or confirmed revenue.
Source date: Live source · checked 2026-10-26Tract describes a 339-acre industrial site on San Antonio's south side with designs supporting 720 MW. Facility-level sales, profit and operating overhead are not disclosed on this source.
Source date: Live source · checked 2026-10-26Tract lists 265 acres, 500 MW and mid-2028 planned energization near Castroville. Developer capacity figures should not be treated as operating occupancy.
Source date: Live source · checked 2026-10-26Vantage announced an investment plan exceeding $25 billion and a 1.4 GW campus spanning ten planned data centers. Announced investment is not revenue or profit; the 2025 delivery schedule needs current confirmation.
Source date: 2025-08-19Crusoe reported Google's campus under construction and connected to adjacent Goodnight wind generation. The source distinguishes an operational 265.5 MW wind farm from another 265.5 MW farm under construction; those are generation assets, not campus IT capacity.
Source date: 2026-09-28Energy Transfer’s February 10, 2025 release describes up to 450,000 MMBtu/day of gas, potentially supporting about 1.2 GW, conditional on customer-backed FID. Its Q3 2026 operating target is now past; this review did not establish commissioning. Facility revenue, profit and overhead: not disclosed in this source.
Source date: 2025-02-10ERCOT's official process hub contains large-load interconnection requirements and Batch Zero material. Queue requests must not be counted as firm demand, completed facilities or secured power.
Source date: 2026-09-18The March 2026 filing reports first-quarter consolidated operating revenue of $1.635 billion and property operating/maintenance expense of $638.5 million. These corporate totals are neither a Texas-site P&L nor the latest quarter; use the issuer's subsequent filings for updates.
Source date: 2026-03-31Searches this curated source directory, not the entire web. Source dates can change; verify the original.
The browser tool is free. Your inputs stay in this page until you export or leave it; no shared project database is opened. Sign in for account-scoped saving and AI-assisted research or design. After the 12-hour trial, general AI usage is metered at 5× verified provider cost, with data additions from $9.99.
Open My Private Workspace →No. Finding prospective business customers requires sign-in and an available free or paid lead allowance. See The Two-Prospect Trial or Compare Lead Packages.